Penmann recently finalised a significant HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a purpose-built ventilation and climate control system engineered to meet strict hygiene and production requirements. The project encompassed the end-to-end implementation of cutting-edge HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. Based on https://onelifesocial.com/story6065427/the-penmann-team-completes-major-hvac-upgrade-for-the-liverpool-based-nutricia-facility-to-align-with-the-fsi-development-programme